Cost Analysis Report | MMA E31A

  • Report Summary
  • Optional Analyses & Support
  • How to Buy

Analysis Basis: United States   |   2018 Q1   |   52 pages   |   Online Viewable Report Delivered in PDF Format

This report presents an up-to-date, detailed cost analysis (based on 2017/18 economic data) of Methyl Methacrylate (MMA) production from isobutylene using an oxidation process. The process examined is similar to Sumitomo/Nippon Shokubai process. In this process, methacrylic acid (MAA) intermediate is initially produced by two-stage catalytic oxidation of isobutene. Then, MAA is esterified with methanol to produce MMA.

The economic analysis provided in the report targets a United States-based plant and discloses:

  • All costs involved in starting a new industrial plant (capital investment):
    • Cost of construction:
      • Main process units
      • Surrounding infrastructure
      • Contingency
    • Additional owner’s costs
    • Working capital
    • Plant commissioning and start-up
  • All costs surrounding the production of Methyl Methacrylate:
    • Raw materials acquisition & utilities generation (manufacturing variable costs)
    • Labor wages, maintenance, operating charges, overhead, taxes and insurance (manufacturing fixed costs)
    • Administration, research and product distribution (corporate overhead costs)
  • Relevant technical coefficients:
    • Raw materials consumption & products generation
    • Labor requirements
  • Process block flow diagram
  • Description of the industrial plant:
    • Main process units
    • Site infrastructure

Key reference(s): (1) EP Patent 1052017, issued to Nippon Shokubai in 2012; (2) "Methacrylic Acid and Derivatives", Ullmann's Encyclopedia of Industrial Chemistry, 7th edition

We highly encourage you to see a preview of this report - you will get a clear notion of the information you will get with this report. This preview shows you report table of contents, abstract, content excerpts, report development methodology and more.

You may add optional analyses and/or data that complement the report Methyl Methacrylate from Isobutylene - Cost Analysis - MMA E31A. Such optionals can only be purchased with this report.

    Capital Investment Details

  • Plant Construction Cost Breakdown per Discipline
    Sample*:  
    Online
     |  Download
    • Get a more detailed perspective on the Plant Construction Cost and understand the impact of direct construction costs and indirect construction costs.
    • The analysis presents the plant construction cost divided in direct costs, indirect costs and contingency.
    • Direct costs broken down into bare equipment, equipment setting, piping civil, steel, instrumentation & control, electrical, insulation, and painting.
    • Indirect costs are divided in engineering & procurement,construction material & indirects, general & administrative overheads and contract fee.
    • Buy this optional analysis for USD 149
  • Economic Analysis for Different Capacities
    Sample*:  
    Online
     |  Download

    Analysis depicting how the economics of the process is impacted by the plant scale. This study considers alternative capacities and present, for each scenario, the following figures:

    • Plant cost, broken down into process units (ISBL), process contingency, site infrastructure (OSBL) and project contingency.
    • Working capital and additional capital requirements
    • Variable and fixed operating costs, as well as depreciation
    • Remaining components of product value: corporate overhead and return on capital employed (ROCE)

    Purchase the report in the 'Download PDF' format and also get an interactive spreadsheet in which the user may define an alternative capacity and check the change of the above mentioned figures.

    Buy this optional analysis for USD 149

  • Process Unit Cost Breakdown per Pieces of Equipment
    Sample*:  
    Online
     |  Download
    • Report presenting a percentage breakdown of the investment necessary to the erection of the process unit (also known as inside battery limits, ISBL), per functional unit included in the process. Each functional unit is a significant step in the process (i.e., distillation, reaction, evaporation).
    • Buy this optional analysis for USD 399
  • Infrastructure Cost Breakdown per Pieces of Equipment
    Sample*:  
    Online
     |  Download
    • Report presenting a percentage breakdown of the investment necessary to the erection of the site infrastructure (also known as outside battery units, OSBL, or offsite facilities), per storage facilities, utilities facilities and auxiliary facilities.
    • Buy this optional analysis for USD 299
  • Project & Construction Implementation Schedule
    Sample*:  
    Online
     |  Download
    • Know upfront a preliminary project implementation schedule, encompassing the period from the decision to invest to the start of commercial production.
    • Schedule divided in (1) Basic Engineering, (2) Detailed Engineering, (3) Procurement, (4) Construction, and (5) Plant Start-up.
    • Buy this optional analysis for USD 199
  • Production Cost Details

  • Utilities Consumption Breakdown
    Sample*:  
    Online
     |  Download
    • Detailed assessment of utilities consumption, presented per utility (e.g., steam, cooling water, electricity.)
    • View utility consumption rates per unit of product generated.
    • Know the share of each utility in the total utility costs.
    • Buy this optional analysis for USD 199
  • Economics for Another Plant Location

  • Plant Capital Investment Analysis in a Country of Choice
    Sample*:  
    Online
     |  Download
    • This report shows how the investment necessary to the erection of the industrial plant is impacted by different local conditions.
    • Examine plant capital investment in a selected country (e.g. the United States, China, Germany, Kuwait, Singapore, Japan and Brazil.)
    • Buy this optional analysis for USD 299
  • Capital & Production Cost Summary in a Country of Choice
    Sample*:  
    Online
     |  Download
    • This supplemental analysis summarizes in a single datasheet the capital and production costs related to the process examined in a selected country (e.g. the United States, China, Germany, Kuwait, Singapore, Japan and Brazil.)
    • Learn the investment required to construct a plant in the selected country (broken down into fixed capital, working capital and additional capital expenses).
    • Know the production cost with the same level of detail of the report.
    • Buy this optional analysis for USD 299
  • Technical Details

  • Process Flow Diagrams & Equipment List
    Sample*:  
    Online
     |  Download
    • Schematic representation of relevant operations of the process, indicating main process streams, equipment and utilities.
    • Buy this optional analysis for USD 499
  • Support

  • Basic Support Package (All responses are provided exclusively via Email)
    • Clear questions with the experts who wrote this report.
    • All responses are provided exclusively via Email.
    • All inquiries are provided by Intratec Support Team in 3 business days.
    • The support is available for 14 days after report delivery.
    • The support is limited to 4 man-hours from Intratec Experts (equivalent to 8 specific questions about the report and optional analysis ordered).
    • Buy this support package for USD 499

* Optional Analyses will be delivered as downloadable files only for those who purchase the report in the 'Download as PDF' format MMA E31A.

All samples presented cover Polymer Grade (PG) Propylene production from ethylene and raffinate-2 using a metathesis process.

Although these samples do not cover the specific industrial process in which you may be interested in, they clearly demonstrate, in advance, the type of information you will get when you order each optional analysis.

1 Add Report to Cart

Just click on the button "ADD TO CART", on the right.

2 Add Optionals to Cart

You may add optional analyses and/or data that complement the report. You may also request technical support, to clear questions after report delivery.

3 Login or Register

Login to proceed with your purchase. If you do not have an account, you can create one in less than 1 minute.

4 Inform Billing Info

Provide us your billing info. Invoices will be issued according to the info provided.

5 Review Order & Pay

If you registered as an individual or small/medium company (less than 50 employees), you can pay using credit cards - our secure platform accepts Visa, MasterCard, Discover and American Express.

If you registered as a corporate client, you will be redirected to our secure payment provider, FastSpring, which accepts a range of payment options (credit cards, bank transfer, PayPal, Amazon Payments, Proforma Invoice).

Intratec reports can be delivered in two formats: as online viewable reports, or as downloadable PDF digital files. The delivery format is selected during the report purchase, when the report is added to the cart.

After Intratec team updates a report ordered, it is made available either for online access or for download in a private area at Intratec website. Reports delivered as online viewable reports will be accessible for 365 days after report delivery, in a private area at Intratec website.

Select a Report Format

USD

USD

Production Cost Report

Why Choose Intratec?

  • 1  Up-to-date economic analyses
  • 2  Independent assessments
  • 3  Reliable Information
  • 4  Trusted by leading companies

Evaluate Other Plant Locations

This report presents an analysis of capital and operating costs of a United States-based industrial plant.

For those interested in economic assessments considering other plant locations, Intratec offers optional analyses that complement this report.

Additional Info

  • Report Introduction: This report presents an up-to-date, detailed cost analysis (based on 2017/18 economic data) of Methyl Methacrylate (MMA) production from isobutylene using an oxidation process. The process examined is similar to Sumitomo/Nippon Shokubai process. In this process, methacrylic acid (MAA) intermediate is initially produced by two-stage catalytic oxidation of isobutene. Then, MAA is esterified with methanol to produce MMA.
  • Report Price: 1099
  • Report Theme: Methyl Methacrylate
  • Report ID: MMA E31A
  • Report Title: Methyl Methacrylate from Isobutylene - Cost Analysis
  • Report Express Price: 599
  • Delivery Time: 5 business days
  • Delivery Time Express: 1 business days
  • Chemical SEO Name: Methyl Methacrylate
  • Analysis Period (YYYY QX): 2018 Q1
  • Download Price: 500
  • Report Year: 2017/18
  • Opt #24: 798
  • Opt #25: 299
  • Opt #26: 998
  • Opt #28: 199
  • Opt #33: 299