Commodity Production Costs

Get More Reports with Tiered Discounts

Save 10% on two Ethyl Tert-Butyl Ether Production Cost reports, 20% on three, and 30% on four — discounts automatically applied at checkout.

This study presents an economical analysis of Ethyl tert-Butyl Ether (ETBE) production from FCC C4 raffinate and ethanol using a process similar to UOP's Ethermax process for isobutylene etherification in China. In this process, the etherification reaction of isobutylene from FCC C4 raffinate stream with ethanol is conducted in two steps, the first step being in a conventional reactor and the second in a reactive distillation column.

+ $ 1,620 USD
save extra $ 358 USD

Details: 700 kta China-based plant | Q1 2026 | Issue B | Detailed | Printable

Companion Reports:

This report presents the feasibility analysis of an on-purpose Ethyl tert-Butyl Ether (ETBE) production plant from butane and ethanol in the United States. Initially, n-butane is isomerized to isobutane, which is then subjected to a dehydrogenation, yielding isobutylene. In the final step, generated isobutylene and ethanol react leading to the formation of ETBE. These steps are similar to Butamer, Oleflex and Ethermax processes in sequence.

+ $ 2,160 USD
save extra $ 418 USD

Details: 700 kta United States-based plant | Q1 2026 | Issue C | Detailed | Printable

Companion Reports:

This study presents an economical analysis of Ethyl tert-Butyl Ether (ETBE) production from isobutylene and ethanol in the United States. In this process, isobutylene obtained from a butane hydrogenation plant is submitted to a etherification reaction with ethanol conducted in two steps. The first step is in a conventional reactor and the second in a reactive distillation column.

+ $ 1,800 USD
save extra $ 378 USD

Details: 700 kta United States-based plant | Q1 2026 | Issue D | Detailed | Printable

Companion Reports:

Summary
  • ETBE Production from Raffinate-1

    Detailed Edition | Q1 2026

    700 kta @ Q1 2026

    Downloadable PDF

    $1,799
  • Companion Report @ United States

    $399
  • Companion Report @ Australia

    $399
  • Companion Report @ Belgium

    $399
  • Companion Report @ Brazil

    $399
  • Companion Report @ Canada

    $399
  • Companion Report @ Chile

    $999
  • Companion Report @ Colombia

    $999
  • Companion Report @ Czech Republic

    $399
  • Companion Report @ Finland

    $399
  • Companion Report @ France

    $399
  • Companion Report @ Germany

    $399
  • Companion Report @ Hungary

    $399
  • Companion Report @ India

    $399
  • Companion Report @ Indonesia

    $399
  • Companion Report @ Italy

    $399
  • Companion Report @ Japan

    $399
  • Companion Report @ Mexico

    $399
  • Companion Report @ Netherlands

    $399
  • Companion Report @ Norway

    $399
  • Companion Report @ Philippines

    $399
  • Companion Report @ Poland

    $399
  • Companion Report @ Russia

    $399
  • Companion Report @ Saudi Arabia

    $399
  • Companion Report @ Singapore

    $399
  • Companion Report @ South Africa

    $399
  • Companion Report @ South Korea

    $399
  • Companion Report @ Spain

    $399
  • Companion Report @ Sweden

    $399
  • Companion Report @ Taiwan

    $399
  • Companion Report @ Thailand

    $399
  • Companion Report @ Turkey

    $399
  • Companion Report @ United Kingdom

    $399
  • Report(s) Delivered as Print-Enabled PDF File(s)

    $399
  • Subtotal
    $1,799 USD
Summary
  • ETBE Production from Raffinate-1 Report

    Production Costs Report | Detailed Edition
    $1,799
  • Total
    $1,799 USD