Bespoke Production Cost Report

Get a reliable production cost report for any process not yet in our library — built on the assumptions you define

saas-img
Book Library 2 Streamline Icon: https://streamlinehq.com
Any Process You Need

Request a study for a production route not yet in our report library — even patented or lab-scale processes.

Filter Setting Three Controller Streamline Icon: https://streamlinehq.com
Built on Your Assumptions

Define the key parameters — plant capacity, location, and technology.

Shield Check Streamline Icon: https://streamlinehq.com
Same Intratec Methodology

Receive a report built under the same structure as our standard Commodity Production Costs reports.

Calendar Clock Streamline Icon: https://streamlinehq.com
Recent Economic Data

Assess CAPEX, OPEX, and production costs using up-to-date economic references.

About this Offer

When the process you need to evaluate is not available in our report library, you do not have to start from scratch.

Intratec can develop a bespoke Production Cost Report focused on the route you need to assess — whether it is a patented pathway, a lab-scale process, or even a process described in technical papers. The report is built around the assumptions you define, such as plant capacity, location, and technology.

Developed under the same methodology and structure used in our Commodity Production Costs reports, each bespoke study provides a reliable techno-economic assessment based on recent economic data.

See Full Sample

Request in Three Steps

1
Think About the Scope

First, align with your team on the scope of the analysis: think about the target commodity, process technology, plant capacity, and location. Additional assumptions and references (e.g. patents, articles) will help guide the study. The clearer the scope, the more valuable the Bespoke Report.

2
Get a Quote

Submit the online form with your defined scope and supporting data. Our team will review it and, within 3 business days, send the final quote and payment instructions. The quote is non-binding — you only move forward if it makes sense for you.

3
Development & Delivery

Once payment is confirmed, we develop the bespoke Commodity Production Costs report fully aligned with the assumptions you defined. Delivery happens within a few weeks, with the report following the same structure as our Production Cost reports.

What You Get in Each Report

Behind every cost estimate is a structured view of the process, its requirements, and the economics of building and operating the plant.

Plant Capital Cost Summary

Capital cost required to build the plant examined.


Cash Search Streamline Icon: https://streamlinehq.com
Plant Capital Cost Details

Fixed capital (ISBL, OSBL, and owner's cost), working capital, and additional capital requirements.


Hierarchy 15 Streamline Icon: https://streamlinehq.com
Plant Cost Breakdowns

Process unit (ISBL) and infrastructure (OSBL) costs, plus a plant cost breakdown by discipline.


Stats Chart Streamline Icon: https://streamlinehq.com
Operating Costs Summary

Variable costs and the total operating cost of the plant studied.


Operating Cost Details

Utilities costs, operating fixed costs, and depreciation.


Plant Capacity Assessment

Capital investment and operating costs compared across different plant capacities.


Task Checklist Streamline Icon: https://streamlinehq.com
Production Process Information

Block flow diagram, with descriptions of the process unit (ISBL) and site infrastructure (OSBL).


Task List Cash Streamline Icon: https://streamlinehq.com
Process Consumptions

Raw materials and utilities consumption, by-product credits, and labor requirements.


Hierarchy 3 Streamline Icon: https://streamlinehq.com
Process Diagrams

Process flow diagrams (PFD), equipment list, and industrial site configuration.

📄 Bespoke reports follow the same structure as Commodity Production Reports

Content Highlights

Plant Capital Cost Summary

Summary outlining the capital cost required for building the Butadiene Rubber production plant examined.

Plant Capital Cost Details

Detailing of fixed capital (ISBL, OSBL & Owner’s Cost), working capital and additional capital requirements.

Plant Cost Breakdowns

Breakdown of Butadiene Rubber process unit (ISBL) costs and infrastructure (OSBL) costs; plant cost breakdown per discipline.

Operating Costs Summary

Summary presenting the operating variable costs and the total operating cost of the Butadiene Rubber production plant studied.

Operating Cost Details

Detailing of utilities costs, operating fixed costs and depreciation.

Plant Capacity Assessment

Comparative analysis of capital investment and operating costs for different Butadiene Rubber plant capacities.

Production Process Information

Block Flow Diagram, descriptions of process unit (ISBL) and site infrastructure (OSBL).

Process Consumptions

Raw materials and utilities consumption figures, by-products credits, labor requirements

Process Diagrams

Process flow diagrams (PFD), equipment list and industrial site configuration

💡 Bespoke reports meet diverse business needs

Typical Use Cases

Over the years, our Bespoke Production Cost Reports have been successfully used in multiple ways.

service image

Evaluate emerging processes and innovative routes — from patents and technical articles to lab-scale concepts — supporting R&D teams with preliminary techno-economic assessments.

service image

Assess different scenarios of a single project by adjusting assumptions such as capacity, location, integration of utilities, or by-product generation — enabling sensitivity analysis and evaluation of alternatives.

service image

Compare the economics of alternative projects or configurations, supporting investment screening and helping decision-makers prioritize the most competitive opportunities.

service image

Provide a robust techno-economic foundation for technology selection studies and early-stage conceptual projects, helping organizations compare alternatives and guide strategic decisions.

service image

Understand the cost structures of suppliers and customers by modeling plants at relevant scales and locations, supporting negotiations, benchmarking, and strategic alignment across the value chain.

What Our Customers Say

"Our in-house studies took months and kept almost the whole team busy. Intratec delivered a consistent assessment in just a few weeks."

"Our in-house studies took months and kept almost the whole team busy. Intratec delivered a consistent assessment in just a few weeks."

R&D Manager

European Chemicals Company

"We had only a patent and lab notes to work with. Intratec turned that into a preliminary cost model we could actually discuss."

"We had only a patent and lab notes to work with. Intratec turned that into a preliminary cost model we could actually discuss."

Innovation Director

North American Biofuels Startup

"The bespoke report gave us a solid starting point that accelerated our technology selection."

"The bespoke report gave us a solid starting point that accelerated our technology selection."

Head of Innovation

Latin American Industrial Group

Frequently Asked Questions

No. Bespoke reports follow the same fixed structure as our standard Commodity Production Costs reports. You define the scope — technology routes, plant capacities — but the format and analyses stay consistent.

Once payment clears, delivery typically takes about 15 business days, depending on the complexity of the request — still far faster than the months an internal study can take.

Pricing starts at USD 4,000. The final price depends on complexity, such as how novel the process is and how many references it requires. You receive a formal quote before any work begins.

By default, no — other customers can purchase it after delivery. If you need exclusive access, so the report stays private, we can arrange that for an additional fee.

No. Once delivered, a bespoke report can't be changed — new assumptions require a new request. That's why it's worth defining the scope carefully up front.

After you define the scope, we send a quote with price and delivery details. To proceed, choose your report editions and pay by credit card or bank transfer. Development begins once payment is confirmed.