Request a Bespoke Production Cost Report

Intratec has a broad library of more than 817 reports, which is constantly growing. If none of the off-the-shelf reports presented at our reports store could fit your needs, that is not a problem – here you can request a bespoke report examining the process you are interested in!

The bespoke report will be a Production Cost Report developed on demand for you, tailored to your needs. The study will be focused on the production process of your interest, and will be developed according to assumptions you define, such as industrial plant production capacity and location.

As all Intratec Production Cost Reports, the bespoke report will be based on recent economic data (Q1 2022), and will include:

  • Process Description: raw materials and utilities consumption, products generation, labor requirements, list of equipment, characterization of site infrastructure, process flow diagram (PFD).
  • Capital Cost Analysis: costs of plant construction, working capital, owners' costs, commissioning, start-up and contingency.
  • Operating Cost Analysis: variable costs, fixed costs (salary, benefits & maintenance) and corporate overhead costs.
  • And much more . . .

Bespoke Report Content

Key Process Information

See More

Assessment presenting relevant technical coefficients, accompanied by process description:

  • Raw materials consumption
  • Products generation
  • Labor requirements
  • Main process units description
  • Site infrastructure description
  • Block Flow Diagram

See Less

Utilities Consumption

See More

Detailed assessment of utilities consumption:

  • Utility consumption rates per unit of product generated.
  • Share of each utility in the total utility costs.

See Less

Process Flow Diagram

See More

Schematic representation of relevant process operations

  • Main process streams
  • Main pieces of equipment
  • Main utilities consumed

See Less

Capital Cost Analysis

See More

Analysis depicting all costs involved in starting a new industrial plant (capital investment):

  • Cost of construction (main process units, infrastructure, contingency)
  • Additional owner’s costs
  • Working capital
  • Plant commissioning and start-up

See Less

Implementation Schedule

See More

Preliminary project implementation schedule, encompassing:

  • Basic Engineering
  • Detailed Engineering
  • Procurement
  • Construction
  • Plant Start-up

See Less

Construction Cost Details

See More

  • Process unit (ISBL): cost for each functional unit (e.g. distillation, reaction, evaporation)
  • Infrastructure (OSBL): cost for each storage facility, utility facility and auxiliary facility
  • Costs for plant construction, per discipline

See Less

Operating Cost Analysis

See More

Analysis depicting all costs surrounding the production of chemical:

  • Raw materials acquisition & utilities generation (variable manufacturing costs)
  • Labor wages, maintenance, operating charges, overhead, taxes and insurance (fixed manufacturing costs).
  • Corporate overhead costs

See Less

Capacity Analysis

See More

Analysis of process economics for alternative plant capacities:

  • Plant costs of construction
  • Working capital
  • Variable and fixed operating costs
  • Depreciation
  • Corporate overhead

See Less

Tailored Analyses

See More

Have a study developed according to assumptions you define, such as industrial plant production capacity and location

See Less

Steps to Request a Bespoke Report

1

Identify the Product and the Process of Your Interest

Identify the product and the respective production process you are interested in, by filling the brief form below.
See More

In the form, some basic information, identified with (*), are required.

Specific assumptions to be considered in the bespoke report development, related to industrial site configuration and pricing basis, may also be provided. If not provided, the bespoke report will be developed based on assumptions defined by Intratec.

Providing references about the process (for instance patents, technical articles, brochures, etc), although not required, is highly recommended. Good references about the process will help Intratec in the development of a better bespoke report.

Finally, basic contact information is also necessary, only for sending back the quotation for report development.

See Less

2

Select the Scope of the Bespoke Report

Select one among three options available for the bespoke report scope, knowing preliminary budgets and delivery times. See More

The differences among the three scope options – basic, extended and advanced - are related to the amount/depth of the content, the report format and additional features. The advanced scope is the best option for those needing comprehensive, in-depth reports, as it includes process flow diagram, plant construction costs breakdowns and several other cost analyses.

Bespoke reports with basic scope are delivered as online PDFs, reports with extended scope are delivered as downloadable, non-printable PDFs and reports with advanced scope are delivered as downloadable, printable PDFs. Also, only bespoke reports with advanced scope include technical support.

In this step, one scope option must be selected for the bespoke report.

See Less

3

Review & Submit your Request for Quotation

Review the information provided and submit your request for quotation. Intratec sends the definitive quotation in 2 business days, with instructions for concluding the purchase. Request one quotation for each production process of your interest. See More

In case of acceptance of the quotation, Intratec will send an invoice for payment. Bespoke reports can be purchased via credit cards, wire transfers and local bank transfers.

Upon payment confirmation, Intratec starts bespoke report development. The report is developed remotely by Intratec team. Once the report is ready, it is made available either for online access or for download in a private area at Intratec website.

See Less

Step 1. Identify the Product and the Process of Your Interest

Information about the Product and the Process (*) Required Field

Required Field
Preliminary Budget for Report Development: From $2,900 USD
Required Field
Required Field
Invalid Input
Invalid Input
Please, you must inform a plant capacity for the report. Otherwise, choose the default option for Plant Capacity.
Required Field. Make sure that your description contains at least 250 characters and no more than 1500.
Make sure that this field contains less than 1500 characters.

File Attachments

References about the process (for instance patents, technical articles, brochures, etc). The total size of your attachment(s) must not exceed 10 Mb. Appropriate attachment types are ".pdf", ".txt", ".zip"., ".doc", ".docx", ".ppt", ".pptx", ".xls", and ".xlsx".

Invalid Input
Invalid Input
Invalid Input

Note: Providing references is optional. Kindly note, however, that good references about the process will lead to a better report.

Contact Information (*) Required Field

Required Field
Required Field
Required Field
Required Field
Required Field