Production Cost Report
0
{"versions":{"1":"9","2":"13","3":"22"}}
{"versions":{"1":"21","2":"27","3":"33"}}
pef-e11a
USA
Polyethylene Furanoate
Polyethylene Furanoate Production from FDCA
(1) WO Patent 2015137807, issued to Furanix Technologies in 2015 (2) US Patent 6749821 issued to UOP in 2004

This report presents an up-to-date, detailed cost analysis of Polyethylene Furanoate (PEF) production from monoethylene glycol (MEG) and 2,5-furandicarboxylic acid (FDCA). The process examined is a generic process In this plant, FDCA and MEG are polymerized to PEF in two polymerization steps in order to obtain Bottle-Grade PEF: melt-phase polymerization and solid-state polymerization.

{"versions":{"1":{"1":"1199","2":"1199","3":"1199"},"2":{"1":"1999","2":"1999","3":"1999"},"3":{"1":"3399","2":"3399","3":"3399"}},"currency":"USD"}
{"versions":{"1":{"1":{"time":5,"price":0},"2":{"time":1,"price":299}},"2":{"1":{"time":5,"price":0},"2":{"time":1,"price":299}},"3":{"1":{"time":7,"price":0},"2":{"time":3,"price":299}}},"unit":"d"}
["1","2","3"]
United States
{"versions":{"1":"76","2":"86","3":"106"}}
PEF E11A
This report presents the economics of Polyethylene Furanoate (PEF) production from monoethylene glycol (MEG) and 2,5-furandicarboxylic acid (FDCA). In the process under analysis, FDCA and MEG are polymerized to PEF in two polymerization steps: melt-phase polymerization and solid-state polymerization. The economic analysis provided assumes a plant located in the United States.
1
1
300.00
kta
0

Polyethylene Furanoate Production from FDCA

Production Cost Report | PEF E11A

Details: 300 kta United States-based plant   |   Q2 2023   |   106 pages   |   See Versions  From $1,199 USD

This report presents a cost analysis of a 300 kta (kilometric tons per annum) United States-based plant. You can add a customized cost analysis, assuming another plant capacity and/or location (country), when ordering an advanced version of this report.

This report presents an up-to-date, detailed cost analysis of Polyethylene Furanoate (PEF) production from monoethylene glycol (MEG) and 2,5-furandicarboxylic acid (FDCA). The process examined is a generic process In this plant, FDCA and MEG are polymerized to PEF in two polymerization steps in order to obtain Bottle-Grade PEF: melt-phase polymerization and solid-state polymerization.

This report, PEF E11A, is a best-in-class examination of Polyethylene Furanoate production, providing an in-depth, comprehensive techno-economic analysis of the production technology examined, including:

  • Process Description: raw materials and utilities consumption, products generation, labor requirements, list of equipment, characterization of site infrastructure, process flow diagram (PFD).
  • Capital Cost Analysis: costs of plant construction, working capital, owners' costs, commissioning, start-up and contingency.
  • Operating Cost Analysis: variable costs, fixed costs (salary, benefits & maintenance) and corporate overhead costs.
  • And much more . . .

Key reference(s): (1) WO Patent 2015137807, issued to Furanix Technologies in 2015 (2) US Patent 6749821 issued to UOP in 2004

Report Content Highlights

Capital Cost Breakdown

Investment information on the requirements for starting an industrial plant, including:

  • Fixed capital (ISBL, OSBL & Owner’s Cost)
  • Working capital
  • Plant start-up expenses

Operating Cost Details

Costs related to the commodity production, categorized by:

  • Variable costs (raw materials and utilities)
  • Fixed costs (labor, maintenance, overhead, etc.)
  • Depreciation

Product Value Analysis

All costs associated with the product manufacture, including:

  • Total operating cost
  • Corporate overhead
  • Return on capital employed (ROCE)

Technology Description

Descriptions of the technical aspects of the process:

  • Technology maturity assessment
  • Process unit (ISBL) description
  • Site infrastructure (OSBL) description

Process Requirements

Main technical coefficients related to process operation:

  • Key process input & output figures
  • Utilities consumption breakdown
  • Labor requirements

Comprehensive Diagrams

Diagrams providing a full description of the process:

  • Block flow diagram (BFD)
  • Process flow diagram (PFD) & equipment list
  • Industrial site configuration

Implementation Schedule

Schedule including total project duration, commissioning and start-up:

  • Basic & detailed engineering
  • Procurement & Construction
  • Plant start-up

Capacity Analysis

Impact of capacity change on the following process economic figures:

  • Capital investment
  • Operating cost
  • Product value

Custom Analysis Add-on

Analysis for several scenarios of plant location and capacity:

  • Capital investment details
  • Operating costs details
  • Product value details
Report Versions
 

basic

$1,199 USD


GET STARTED WITH ...

Key Process Information

  • Raw materials consumption
  • Block Flow Diagram
  • Technology Readiness

Capital Cost Analysis

  • Costs of construction (process units, infrastructure, contingency)
  • Working capital, owners' costs, commissioning and start-up

Operating Cost Analysis

  • Fixed and variable costs
  • Overhead

  Pages | Tables | Images

 Online PDF Format

 Updated with Q2 2023 Data

 

 

 

extended

$1,999 USD


EVERYTHING IN BASIC AND ...

Capacity Analysis

  • Capital and operating costs breakdown for different plant capacities

Pricing Basis

  • Main prices assumed in the analysis (raw materials, by-products, utilities)

Utilities Consumption

  • Breakdown presenting utility consumption rates (steam, cooling water, electricity, etc.)

Implementation Schedule

  • Schedule, including duration of major project phases

  Pages | Tables | Images

 Downloadable PDF Format

 Updated with Q2 2023 Data

 

 

 

advanced

$3,399 USD


EVERYTHING IN EXTENDED AND ...

Process Flow Diagrams

  • Schematic representation of relevant operations of the process, indicating main process streams, equipment and utilities.

Construction Cost Details

  • Breakdown of process unit (ISBL) costs
  • Breakdown of infrastructure (OSBL) costs
  • Plant construction cost breakdown per discipline (bare equipment, equipment setting, piping, civil, steel, instrumentation & control, etc)

Custom Analyses Add-on

  • Choose a plant capacity and/or location and receive cost analyses for an industrial plant according to your needs

  Pages | Tables | Images

 Printable PDF Format Add-on

 Updated with Q2 2023 Data

Check Version Details

Check report version details and easily identify which fits you best

View Versions Full Comparison

Quote

Easily print a quote (PDF file) with no commitment

See How to Download a Quote

Check Full Free Samples

Quickly understand reports structure and depth of content

See Full Samples